Golden 24 hours principle
                            ----all the responses should be done within 24 hours!


Step.1   订单       Order 
Step.2   开模分析       DFMEA  
Step.3   模具设计要求      Tooling BOM Form 
Step.4   模具 2D 图纸     Tooling 2D Drawing
Step.5    开工通知单      Cutting Tooling Notice 
Step.6    生产进度表       Weekly Report 
Step.7    模具3D       Tooling  3D drawing 
Step.8    检测报告      Dimension Report of T1 sample
Step.9    箱麦        Packing Information 
Step.10   走模光碟   CD
Step.11   顶出机构测试 3000 cycles testing for tooling ejecting system
Step.12  模具测试手册       Plastic Mould Operation Manual